Why the first trader to reply usually wins the job

In this article

You know the drill. A homeowner's boiler packs up on a cold Monday morning, or water starts coming through the kitchen ceiling. They grab their phone, ring three or four local trades, leave a couple of voicemails, and wait. 

You're up a ladder or under a sink when the call comes in. By the time you've finished the job, cleaned up and checked your phone, it's gone six. You ring back, only to hear: ‘Sorry mate, someone's already coming out tomorrow.’ 

It wasn't your price. It wasn't your workmanship. Someone else simply got there first. 

It happens more than most of us would like to admit. When we surveyed UK tradespeople, more than half told us they have definitely or probably lost work because a quote went out too slowly. That's a lot of good jobs going to someone else, not because the other trader was cheaper or better, but because they were quicker.

Why speed wins

When a customer asks for a quote, they're usually in one of two moods. Either something has gone wrong and they're stressed, or they've finally decided to get a job done and want to crack on. Either way, the trader who replies first takes that weight off their shoulders. 

A fast quote also sends a message. Customers can't see your workmanship until the job is finished, so they judge you on what they can see. If you're quick, clear and organised before you've even picked up a tool, they assume you'll run the job the same way. 

And then there's simple momentum. By the time a slow quote arrives, the customer has often already said yes to someone else. It doesn't matter how good your price is if it lands a day too late.

Why quotes go out late

None of this is because tradespeople don't care; quite the opposite. Most traders are flat out. You're on the tools all day, and the quoting gets done at the kitchen table at 10pm, when everyone else has gone to bed. 

That pressure shows up clearly in The NOW Report, national research into the working lives of UK tradespeople, carried out with Installer Online. A striking 93% of the heating engineers, plumbers, electricians and builders we surveyed said running their business is stressing them out. And on top of chasing new work, they're owed an average of £5,901 in unpaid invoices. When you're chasing money you've already earned, it's no wonder new quotes slip down the list. 

Add in waiting for supplier prices, scribbled notes on the back of an invoice and the very understandable wish to get the price exactly right, and it's easy to see how a quick quote turns into a three-day wait.

How to get your quotes out faster

The good news is that a few small changes can make a big difference. Most of them work whatever tools you use.

  • Reply straight away, even if the price comes later: A quick message saying 'Thanks, I've got your details and you'll have a quote by Thursday' keeps you in the running. Customers mostly want to know they haven't been forgotten.
  • Quote on the spot when you can: For straightforward jobs, giving a price while you're still on site, or the same day, is one of the most effective things you can do. This is when a quoting app on your phone really earns its keep. With the right software, you can build the quote while you're still standing in the customer's kitchen and send it before you've reached the van.
  • Use templates for the jobs you do most: If you fit a lot of boilers or rewire a lot of similar houses, there's no need to start from scratch every time. Keep a price list of your common items and labour, so a quote takes minutes, not an evening. A spreadsheet or a note on your phone is a good start. With quoting software, your saved items drop straight into each new quote, which takes out most of the typing.
  • Set aside a regular quoting slot: 20 minutes at lunchtime or at the end of the day stops quotes from piling up for the weekend. 
  • Make it easy to say yes: A clear, professional quote with the work broken down, and a simple way to accept it, removes any reason to hesitate. Letting customers accept a quote with one tap on their phone, rather than ringing you back, means you hear ‘yes’ sooner. 
  • Follow up: If you haven't heard back in a couple of days, a friendly check-in isn't pushy. It's good service, and it often wins the job. The same goes for chasing payment once the work is done. With the average trader owed nearly £6,000, a polite reminder on the day an invoice falls due is just good business. If you hate chasing, set up automatic reminders so your software does the nagging for you.
  • Don't miss the call in the first place: The race starts the moment the phone rings. If you can't answer while you're up a ladder, check your voicemail at every break, and ring people back the same day. A missed call that's returned within the hour is rarely a lost job. Some trades now go a step further and use an AI receptionist to answer when they can't, take the details and book the job into the diary.

Fast doesn't mean cheap or rushed

None of this is about undercutting anyone or knocking out a sloppy price. Customers still want quality, and Which? Trusted Traders have already shown they provide it. 

It's about making sure good work isn't lost to someone who simply got there first. Whether you use an app, a spreadsheet or a well-thumbed notebook, the principle is the same. Do the job well, and get your quote out quickly. Put the two together and you'll win more of the work you deserve.

About the author

Benjamin Dyer is CEO and co-founder of Powered Now, the all- in- one customer relationship management (CRM) platform for UK trades, bringing lead management, quoting, invoicing and scheduling together in one app, alongside Powered Now Receptionist and Here Is My Work. 

www.powerednow.com